On Thursday the trucks came with the concrete for the ground floor ICF panels.Needless to say, the operation was a success.
Final bracing of walls and pillars
Carefully pouring the concrete into the walls from above
Final results after bracing is removed
For the next floor we will be changing the technique and making horizontal panels 1×3 m.
First row of horizontal panels