More Work on Volunteer Center “Home”
Over the past few months we haven’t posted much as we have been busy preparing our center for the winter. We installed a dual heating system, using a pellet furnace with floor heating for the upstairs, and the “classic” wood stove for the downstairs. We installed 2 stainless steel chimneys for the price of one. We also worked on the outside terrace, which is over 30 m2 and will serve as a dining room in the summer.
For now we have stopped work as we are concentrating on our Christmas Shows and will pick up again in the spring time. Thanks to all who have helped so far with this project.