Building Project – Preparing the Walls
The next step in our construction is to prepare the ICF sandwich. Part of the work was to strengthen the foundation, as originally we had planned a 2 storey building. The boys have been working hard, cutting and preparing the steel mesh, cutting and drilling holes in the styrofoam.
In the meantime, our construction friends strengthened the foundation. We had hoped to complete the outer wall for the first two floors before we began our Christmas shows, but the work took longer than expected. Slowly, but surely the work is continuing.