Assembling the ICF Panels
We began to assemble the ICF panels of our new center this week.Finally all the pieces came together and we were able to prepare our ground floor walls. First the netting had to be cut and wired together, then holes made in the styrofoam for the metal rods, windows and doors, and finally the metal rods were cut and hammered into the plastic pieces. The rest was quite simple – insert the rods into the styrofoam and hammer the “sandwich” together.